History of the USS Cabot (CVL-28)
The USS Cabot (CVL-28/AVT-3) was a U.S. Navy Independence-class light aircraft carrier and the second ship to carry it Boring name. Cabot was commissioned in 1943 and served until 1947. She returned to serve as a training carrier from 1948 to 1955. From 1967 to 1989 she worked as Dedalo in Spain.
She was scrapped in 2002 after unsuccessful attempts to save her.
USS Cabot built as USS Wilmington (CL-79), a Cleveland-class light cruiser, renamed CV-28 on June 2, 1942, and Cabot on June 23, 1942 Bot, and was rebuilt during construction. She was launched on April 4, 1943 by the New York Shipbuilding Company in Camden, NJ; sponsored by Mrs. A. C. Read.
She was reclassified as CVL-28 on July 15, 1943, and commissioned under the command of Captain Malcolm Francis Schaefer on July 24, 1943.
Specification
Basic
Year of Service
1943
Origins
United States
supplement
1,570
staff
Class information
Class
Independent class
Class Size
9
ships
Class
USS Independence (CVL-22); USS Princeton (CVL-23); USS Belleau Wood (CVL-24); USS Cowpens (CVL-25); USS Monterey (CVL-26); USS Langley (CVL-27); USS Cabot (CVL-28); Bataan (CVL-29); San Jacinto (CVL-30)
Operator
Spain; USA
Roles
Flagships/Capital Ships
Take on the role of fleet flagship or capital ship in old battleship design/terminology.
Dimensions and Weight
Length
622. 5 feet
189.74 meters
Ray
109. 1 ft
33.25m
Draft
26. 0 feet
7.92m
Shift
11,000 t
Power and Performance
Installed Power:
4 x boilers and 4 x GE turbines driving 100,000 shp on 4 x axles.
Surface Velocity
32.0 nodes
(36.8 km/h)
Area
13,035nm
(15,000 miles | 24,140 km)
weapons
26 x 40mm Bofors anti-aircraft gun
Aircraft
Up to 34 aircraft of different makes and types. Usually most fighter jets are equipped with dive bombers and torpedo bombers.


