History

OSSIE-D is the maiden flight unit of OSSIE (Orbit Solutions to Simplify Injection and Exploration), a modular orbital transfer vehicle (OTV) developed by Spanish startup UARX Space. The spacecraft was launched on October 1, 2026 aboard SpaceX's Transporter-18 rideshare mission. Prior to launch, deployment of satellites was scheduled for seven and 30 days post-launch.

Immediately after launch, UARX experienced a communications blackout with the spacecraft. The cause was identified as a configuration error on the interface of the ground station service in use. To protect customer missions and account for the spacecraft's limited battery life, UARX co-founder and chief technology officer Andrés Villa Granata said the company decided to send a backup command to the OTV on October 3, two days after launch, to enable fault detection, isolation and recovery automation that would deploy the payloads without ground station intervention. Without reliable two-way communications, UARX could not confirm whether the command was received. After the ground station configuration was corrected, communication with OSSIE-D became nominal and all spacecraft systems performed nominally. Telemetry subsequently confirmed that the backup command had been received correctly and that all commanded deployments were executed.

By October 15, at least 10 PocketQubes had been deployed and contacted by their operators. The maiden flight was also the first demonstration of UARX's SAU&RON 24-inch and 15-inch deployment rings. Customers of OSSIE-D included AMSAT-Deutschland (three ERMINAZ-2 PocketQubes), the Libre Space Foundation, Orion Space of Nepal, Argentina's National Technological University – Haedo Regional Faculty, the National University of La Plata, and Ethereal Space. UARX is remedying the anomalies identified during the flight; additional payloads remain onboard the vehicle for future release.

Specifications

OSSIE-D is a 200-kilogram-class OTV built on the Mira bus. Its green chemical propulsion system uses nitrous oxide and propylene via a Saiph-5-LBF thruster (Integrated SatDrive system from Dawn Aerospace), with a specific impulse exceeding 285 seconds. Maximum delta-v is 240 m/s for a 200 kg payload, with actual performance depending on payload mass and mission profile. The propulsion system can be supplemented or replaced by electric propulsion according to mission requirements.

The vehicle accommodates PocketQubes, CubeSats from 1/4U to 12U, and other small satellites with masses from approximately 250 g to 250 kg. Payloads can be carried in UARX-supplied deployers (including the RAMI CubeSat deployment system and the Picobus Deployer), third-party ejectors, or attached to 8-, 15- or 24-inch SAU&RON separation rings. Hosted payloads retained on the vehicle can use its electrical power and data links. Avionics adopt the cPCI Serial Space open standard for subsystem communication. OSSIE-D carries Dawn Aerospace's Docking and Fluidic Transfer Port, making it the first OTV to do so, opening the possibility for future on-orbit refueling and life-extension work.

OSSIE-D incorporates redundant avionics, communications, and mass-storage units in a single-string architecture with selective redundancy. Power is provided by a solar array and batteries. The vehicle supports missions in low Earth orbit, transfers from geostationary transfer orbit to geostationary orbit, and trans-lunar injection trajectories. Typical operations include raising or lowering deployment orbits, adjusting inclination to maintain sun-synchronous geometry, and phasing satellites within a constellation at regular intervals.

Program status

UARX Space is remedying the anomalies identified during OSSIE-D's maiden flight. Additional payloads remain aboard the vehicle and are expected to be released in future operations. UARX was named an ESA Rising Star in November 2025 and received dual-use certification from the Spanish Ministry of Defense for the OSSIE vehicle, permitting civil and national security missions.

ContactPrivacy Policy
Fatal error: Uncaught TypeError: mysqli_close(): Argument #1 ($mysql) must be of type mysqli, false given in /home/bosahost/tvd.im/engine/classes/mysql.php:238 Stack trace: #0 /home/bosahost/tvd.im/engine/classes/mysql.php(238): mysqli_close() #1 /home/bosahost/tvd.im/engine/modules/main.php(726): db->close() #2 /home/bosahost/tvd.im/engine/init.php(1017): include_once('/home/bosahost/...') #3 /home/bosahost/tvd.im/index.php(28): require_once('/home/bosahost/...') #4 {main} thrown in /home/bosahost/tvd.im/engine/classes/mysql.php on line 238